Factory-direct wholesale since 2016-09-06 · MOQ from 20 pcs · IGI & GRA certified

Sourcing

How to Place Your First Wholesale Jewelry Order

Holycome Trade Desk · July 17, 2026 · 5 min read

A step-by-step walkthrough of a first wholesale order, from the inquiry format that gets you a fast and accurate quote, through the deposit, approval sheet, inspection and customs paperwork.

How to Place Your First Wholesale Jewelry Order

First orders go wrong for predictable reasons: an under-specified inquiry, a verbal agreement instead of a written approval sheet, and a payment made before inspection terms were agreed. This guide walks through the sequence experienced importers follow, in the order it should happen.

Step 1: write an inquiry a factory can quote in one pass

Most first inquiries are one line asking for a price list. That produces a generic list which tells you nothing about your actual cost. A quotable inquiry contains six fields.

FieldExampleWhy it matters
Product type and silhouetteSolitaire ring, six-prong, cathedral settingDetermines the mould and the labour path
Stone and gradeMoissanite, D to F colour, VVS, 1.00 ct equivalentTypically 20% to 60% of unit cost
Metal and purity925 sterling silver, rhodium platedThe single largest cost variable in silver
Quantity per design200 pieces across four designs, 50 eachSets your tier and the production run length
Destination countryUnited KingdomDrives duty, documentation and compliance advice
Target retail price79 to 99 poundsLets the factory propose a workable specification

With those six fields a capable factory returns a costed quotation with stone, metal, labour, plating and packing broken out separately. Insist on that breakdown, because a single lump-sum price cannot be negotiated intelligently: you cannot see which line to change.

Step 2: read the quotation properly

  • Check the metal weight. It should be stated per piece in grams. If it is missing, ask for it. Metal is the line item most often quietly reduced.
  • Check the plating specification. Rhodium plated is not a specification. Ask for a micron figure.
  • Check the stone grade against the price. A 1.00 ct equivalent moissanite at a suspiciously low price is usually a smaller stone or a lower grade than quoted.
  • Check what certification costs extra. GRA or IGI grading is normally quoted separately per stone, not included in the unit price.
  • Confirm the pricing validity window. We hold quoted metal prices for 15 days. Anything longer than 30 days is a risk on gold.

Step 3: agree the approval sheet before paying

The approval sheet is a one-page document that becomes the contractual reference for the whole order. It must contain stone grade with tolerances, where plus or minus one colour grade and one clarity grade is a normal trade standard; metal and purity; plating thickness in microns; target weight per piece with tolerance; dimensions; packing specification; lead time in working days; and the payment schedule. Both sides sign it. If a supplier resists signing a simple one-pager, treat that as your answer about how the relationship will go.

Step 4: pay the deposit the right way

Payment routeTypical termsWhen to use it
T/T bank transfer30% deposit, balance before shipmentRepeat orders with an established supplier, lowest fees
PayPalUsually 100% upfront, 3% to 4% feeSmall trial orders under about 1,500 US dollars
Western Union100% upfrontOnly where bank transfer is impractical; no chargeback protection
Platform escrowEscrowed, released on confirmationFirst order with a new supplier, worth the small fee
Letter of creditAt sight, or 30 to 60 daysOrders above roughly 50,000 US dollars

For a first order with an unknown factory, escrow or a small full-payment trial is the rational choice. Do not send a large deposit to an entity you have not audited.

Step 5: manage production, do not wait for it

Ask for three checkpoints: a photograph of the approved sample or the first-off piece, a photograph of the parcel before polishing, and a photograph of the packed cartons with weights before sealing. Each takes the factory two minutes and gives you three opportunities to catch a problem while it is still cheap to fix.

Step 6: inspect on arrival, then write the difference down

  • Count the pieces against the packing list before anything else.
  • Spot-check 10% against the approval sheet: weight, dimensions, stone grade, plating colour.
  • Check the certificate inscriptions against the report numbers.
  • Photograph anything out of specification immediately, with the SKU label visible in the frame.
  • Report deviations in writing within the claim window. Fourteen days from delivery is a normal trade standard.

Step 7: plan the reorder before you sell out

Set a reorder point per SKU, typically two units remaining. Because setup and mould costs are already amortised on a repeat design, the second order is usually 8% to 15% cheaper at the same quantity. Negotiate that improvement explicitly, and ask for a scheduled replenishment agreement so your restocks share a production run and a freight cost.

The realistic first-order timeline

StageTypical durationNotes
Inquiry to costed quote12 to 24 working hoursFaster if your inquiry has the six fields
Quote to approval sheet signed2 to 5 daysDepends on how many specification changes you request
Deposit to sample or first-off5 to 10 daysStock designs only; new moulds take longer
Bulk production12 to 20 daysAdd 5 to 7 days for gold casting runs
QC, certification, packing3 to 5 daysLonger if third-party grading is involved
Express shipping3 to 7 days to EU and USDHL, FedEx or UPS, insured

Total: roughly five to seven weeks from a well-written inquiry to goods in hand. Budget eight weeks for a first order with custom elements, and treat anything promised in under three weeks as either stock you have not specified or a lead time that will slip.

Related Articles

Authoritative References

For buyers who need to verify the technical and regulatory basis of this guide, the following independent institutions publish authoritative reference data:

Topics: first wholesale jewelry order, how to buy jewelry wholesale, first order process, trial order jewelry

Sourcing lab grown stones at wholesale?

Send us your specifications and target quantity — you will get a costed factory quotation within 12 working hours.

Request a quote

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .

Shop the guide

Wholesale items related to this guide

All products

Keep reading

Related buying guides

Get a factory quote in 12 hours

Send us your stone list or design files — we quote with real factory pricing.

Products Search Quote WhatsApp