Jewelry OEM Sampling: The CAD to Production Timeline

Holycome Trade Desk · March 1, 2026 · 5 min read

A realistic week-by-week timeline from a sketch or reference photo to bulk production, including what causes the delays, how many revision rounds to budget for, and how to approve a sample properly.

Jewelry OEM Sampling: The CAD to Production Timeline

Custom jewellery development fails on timelines more often than on quality. Buyers budget two weeks for sampling because that is what a supplier promised, then lose a season when it takes five. This is the sequence with realistic durations, and the points where schedules actually slip.

The full sequence with realistic durations

StageDurationWhat you receiveCommon delay cause
Brief and feasibility1 to 2 daysFeasibility note, stone options, indicative priceVague reference images
Quotation2 to 3 daysCosted quote with stone, metal, labour and mould broken outSpecification changes mid-quote
CAD and 3D render3 to 5 daysRender from three angles plus top viewBuyer requests many small changes
Revision rounds2 to 3 days eachUpdated renderUnderestimating rounds needed; budget two
Mould and wax3 to 5 daysWax photograph before castingDesign complexity
Cast, set and polish sample5 to 8 daysPhysical sample with stone setStone sourcing for unusual sizes
Sample shipment3 to 7 daysInsured express parcelCustoms documentation
Sample approval1 to 3 daysSigned approval sheetBuyer-side decision time
Bulk production12 to 20 daysProduction runQueue position behind larger clients
QC and certification3 to 5 daysQC report, certificatesThird-party grading turnaround
Packing and dispatch2 to 3 daysCarton photographs, documentsCustom packaging printing run

Realistic total: six to nine weeks from brief to goods in hand for a new design. If you are launching for a season, start twelve weeks out. A supplier promising three weeks is describing stock adaptation, not a new mould.

Writing a brief that does not require three revisions

  • Give dimensions, not adjectives. A 7 mm wide band, 2.2 mm thick, with a 1.0 ct centre, rather than chunky but elegant.
  • Give a reference with a purpose. Say what you like about it: the prong style from image A, the shank profile from image B.
  • State the stone and grade up front. Changing stone size after CAD invalidates the render.
  • State the metal and target weight. Metal weight drives both cost and how the piece feels in the hand.
  • State your retail price point. It lets the factory propose a workable specification rather than quoting something unsellable.
  • Send vector or high-resolution source files for any logo or engraving.

Budget for two revision rounds

RoundTypical changeCost implication
Round 1Proportions, prong style, shank thicknessUsually free, because CAD is parametric at this stage
Round 2Stone size, setting height, gallery detailSometimes free; may require a new mould drawing
Round 3 and beyondFundamental redesignNormally charged as a new development

Ask at the quotation stage how many revision rounds are included. Two is a fair standard. Unlimited revisions usually means the cost is hidden elsewhere.

Approving a sample properly

Check on the sampleAcceptance criterion
Stone grade and sizeMatches the specification sheet; request the certificate with the sample
Prong security and symmetryNo gap, no rocking, gaps equal within 0.2 mm
WeightWithin plus or minus 5% of the agreed target weight
DimensionsBand width and thickness within 0.2 mm
Plating and finishEven colour, no edge thinning, mirror polish inside the shank
ComfortNo sharp edge on the inner band; the piece sits level on the finger
Setting heightMatches the render; not raised or lowered without agreement

Approve in writing against the specification sheet, and attach photographs of the approved sample. That sample becomes the master reference for the bulk run, which is the single most useful document in the whole order, because it converts it looks different into a measurable comparison.

Where suppliers and buyers actually lose time

  • Buyer-side decision latency. The most common cause by far. Every day you sit on a render adds a day to delivery.
  • Stone sourcing for non-standard sizes. A 1.35 ct pear is not a stock size. Add five to eight days if your specification is unusual.
  • Custom packaging. Printed boxes and care cards have their own production lead time of 10 to 15 days. Order them in parallel, not after approval.
  • Third-party grading. IGI grading adds turnaround outside the factory control. Certify a subset rather than the whole run if the deadline is tight.
  • Change orders after production starts. Acceptance of a mid-run change resets the schedule and is correctly charged.

Running development in parallel with sales

WeekDevelopment activityCommercial activity
1 to 2Brief, quote, CADPre-sell the render to gauge demand
3 to 4Revisions, mould, samplePrepare listing copy and sizing content
5 to 6Sample in hand, approvedShoot the physical sample; open pre-orders
7 to 9Bulk productionFinalise packaging and launch assets
10 to 12QC, packing, shippingSchedule the launch for arrival week

Buyers who run development and commercial preparation in parallel launch within days of arrival. Buyers who do them sequentially lose two to three weeks of selling time on every new design, which across a season is the real cost of OEM development.

Related Articles

Authoritative References

For buyers who need to verify the technical and regulatory basis of this guide, the following independent institutions publish authoritative reference data:

Topics: jewelry OEM sampling, CAD to production jewelry, custom jewelry timeline, jewelry sample approval process

Sourcing lab grown stones at wholesale?

Send us your specifications and target quantity — you will get a costed factory quotation within 12 working hours.

Request a quote

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .

Shop the guide

Wholesale items related to this guide

All products

Keep reading

Related buying guides

Get a factory quote in 12 hours

Send us your stone list or design files — we quote with real factory pricing.

Products Search Quote WhatsApp